Answer:
C) 0.20
Explanation:
We know that,
Process time = Manufacturing cycle efficiency (MCE) × average throughput time
where,
Average throughput time = Process time + Inspection time + Move time + Queue time
= 1.9 + 0.1 + 2.7 + 4.8
= 9.5
And, the process time would be 1.9
Now put these values to the above formula
So, the efficiency would equal to
1.9 = Manufacturing cycle efficiency (MCE) × 9.5
So, Manufacturing cycle efficiency (MCE) would be 0.20