Respuesta :

The work done in lifting the block is 3430 J

Calculating work

From the question, we are to determine the work done in lifting the block

Using the formula,

Work done = mgh

Where m is the mass

g is the acceleration due to gravity

and h is the height

From the question,

m = 50.0 kg

g = 9.81 m/s²

h = 7.00 m

Putting the parameters into the formula,

Work done = 50.0 ×9.8 × 7.00

Work done = 3430 J

Hence, the work done in lifting the block is 3430 J

Learn more on Calculating work done here: https://brainly.com/question/14460830

#SPJ1

ACCESS MORE
ACCESS MORE
ACCESS MORE
ACCESS MORE