b454c5ci9j b454c5ci9j 20-09-2021 Mathematics contestada From a 200-ton pile of coal, a conveyor belt removes 1 ton per minute. By lunchtime, only of a ton was left on the pile. Which equation can be used to find x, the number of minutes the conveyor belt was used to remove coal before lunch?