it would take 15 men 8 days to dig a trench 240 m long find how many days less it would take 18 men to dig a trench 360m long working at the same rate​

Respuesta :

Answer:

24 men will take 3 days to dig a 72 meter trench.

Step-by-step explanation:

If 16 workers dig an 80-meter long trench in five days, how long will it take 24 workers to dig a 72-meter long trench?

If 16 workers take 5 days to dig an 80 meter long trench,

24 workers will definitely take lesser time to dig a 72 meter long trench as both the length of the trench and the number of workers is more

Lets write these values down in order: Number of Workers, Length of Trench, Number of Days:

16 80 5

24 72 ?

Lets represent the ? as x:

We know that Ratio of Trench length to men = 80/16 : 72/24 or 5 : 3

Which means that the first set (16 men) will take 5 days to dig a trench of 80 meters.

And therefore from the above ratio (5: 3), 24 men will take 3 days to dig a 72 meter trench.

HOPE IT WILL DEFINITELY HELP YOU

ACCESS MORE
ACCESS MORE
ACCESS MORE
ACCESS MORE