The setup time for a batch of 250 products is 30 minutes while the production time is 5 minutes for each product. If the batch size goes up to 400, what will be the effect on product manufacturing time?

a. Increase by 0.04 minutes
b. Decrease by 0.055 minutes
c. Increase by 0.02 minutes
d. Decrease by 0.045 minutes