Fickel Company has two manufacturing departments-Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are exist16.00 per direct labor-hour and exist12.00 per direct labor-hour, respectively. The company's direct labor wage rate is exist20.00 per hour.
The following information pertains to Job N-60:
Required: What is the total manufacturing cost assigned to Job N-60?
If Job N-60 consists of 10 units, what is the unit product cost for this job?
(Round your answer to 2 decimal places

Respuesta :

Answer:

What is the total manufacturing cost assigned to Job N-60?

  • $753

If Job N-60 consists of 10 units, what is the unit product cost for this job?

  • $75.30 per unit

Explanation:

the information is incomplete, so I looked it up:

Overhead rates:

Assembly = $16 per direct labor hour

Testing and packaging = $12 per direct labor hour

Direct labor rate = $20 per hour

Job N-60:

direct materials = $340 + $25 = $365

direct labor = $180 + $40 = $220 (11 hours)

overhead rate = (9 x $16) + (2 x $12) = $168

total cost for Job N-60 = $753

cost per unit = $753 / 10 = $75.30

Ver imagen jepessoa
ACCESS MORE
ACCESS MORE
ACCESS MORE
ACCESS MORE