A contractor must choose between buying or renting a crane for the duration of a 5 year construction project. The contractor uses an MARR of 8%. At the end of the project, the crane can be sold for 21% of its initial cost. The cost to operate and maintain the crane is $210,000 per year. Renting the crane costs $330,000 per year including all operating and maintenance costs.

Determine the maximum amount the contractor should pay to purchase the crane (i.e. the breakeven initial cost of the crane).