John is runnig his Database application on a single server with 24 Gigabytes of memory and 4 processors. The system is running slow during peak hours and the diagnostic logs indicated that the system is running low on memory. John requested for additional memory of 8 Gigabytes to be added to the server to address the problem. What is the resultant type of scaling that John is expecting?