The project plan is supported by:
1. The work breakdown structure, the budget, and the work packages.
2. The work breakdown structure, the budget, and the schedule.
3. The work breakdown structure, the work packages, and the schedule.
4. The work breakdown structure, the schedule, and the contingency plan.