A plumber loads his truck each morning with faucets that will be needed for the service calls and other emergency calls that come in that day. Based on past​ experience, the number of faucets required each day​ (N) has the following​ distribution: ​p(0)equals​.05; ​p(1)equals​.25; ​p(2)equals​.5; ​p(3)equals​.15; ​p(4)equals.05. The expected value of N is then 1.9 faucets required per day. Each faucet requires 25 minutes to install. What is the expected number of minutes the plumber will spend each day installing​ faucets?